Mr. Pappas of the YukonGroup representing AT&T has provided the coverage maps for the proposed site. If you are located South/West of the Crown Valley/Soledad Canyon intersection this project may be of special interest to you. The projects intent is to increase AT&T cell coverage and FirstNet (first responders network coverage) to the area. Proposed as a hillside water tank, these coverage maps show a computer simulation of the signal strength when the tower is constructed at various heights above the hillside.
Questions and comments may be posted here and/or directed to [email protected]; [email protected]
CLL04717_Prop_Maps CLL04717_Prop_Maps Different Heights
Proposed cell tower, presentation will be April 1, 2019
CLL04717 - 100ZD - Rev 0 - NEC - 01-09-19